Facilities

  • -Jetty and quay walls with skid way
  • -Separate workshops for plate/profile cutting, piping, preassembly, coating, etc
  • -Crawler crane with capacity of to 250 tons (6-units)
  • -Heavy duty cranes and modern machineries
  • -۱۰۰۰ton launch barge for transportation and installation
  • -Overhead crane (7 cranes)
  • -Construction area for jacket and topside
  • -CNC machine for cutting pipe, profile and plate (Muller Cutting Machine)
  • -۳۰hectares of land with access to jetty
  • -Construction workshop (15m*50m)
  • -Assembly and installation parking (400m*140m)
  • -Load-out jetty with 4000 tons & 8000tons capacity